Fort NatatoriumFort Natatorium was completed in 1988 as phase one of what became the Shirk Center athletic and recreational complex. It has an 8 lane, 25 yard by 6 lane, 25 meter swimming pool, equipped with 1 meter and 3 meter diving boards and a 300-seat spectator area. (302 E. Emerson Street) |
The Fort Natatorium is accessible from the ramp at the North entrance to the building.
|